Industrialized Construction (IC)
Industrialized construction is an approach that aims to enhance performance, productivity, and certainty in the construction industry by reducing unnecessary variation.
It represents a shift from the current way of project based working towards a model that is characterised by common / standardised processes, mechanised production, and advanced technology.
By applying an industrialized approach, numerous longstanding issues can begin to be addressed, creating new opportunities for innovation and efficiency, including
- Enhanced productivity and cost-efficiency through standardised processes and economies of repetition
- Greater predictability and certainty in project outcomes, reducing risks and variability
- Seamless data exchange and integration of digital tools and techniques throughout the development lifecycle
- Improved quality and safety due to controlled manufacturing environments and consistent procedures, resulting in higher-quality buildings with fewer defects
- Increased sustainability with reduced waste, better resource management, and promotion of circular economy principles
- Adaptability to meet specific project needs while maintaining efficiency
- Transformed supply chains featuring long-term relationships and collaborative innovation
- Broader and more diverse workforce opportunities with stable employment, skills development, and training programs for new technologies and processes
- Continuous improvement across multiple programmes and projects, fostering sector-wide learning
- Improved industry resilience through reduced uncertainty and volatility, encouraging investment in innovation
At Akerlof we have always tried to adopt a broad definition of MMC – as contemporary innovations that include new technologies (such as digital tools and techniques), offsite manufacture and the use of efficient processes to deliver better outcomes.
We recognise however that much of the industry views MMC as synonymous with offsite, prefabricated solutions, particularly volumetric modular. We want to shift the horizon toward towards more fundamental and far-reaching transformation. To delineate when were talking about a wider, programmatic based approach, we adopt the term industrialized construction.
Change the way you look at things and the things you look at change
This shift is characterised by:
- Systems Thinking: Encouraging a holistic, system-level approach to transform the entire delivery model, moving beyond the adoption of manufactured solutions within the existing project-by-project, engineer-to-order model.
- Sector-Wide Impact: Seeking transformation at a sector level, beyond discrete, individual projects.
- Business Model Innovation: Enabling fundamental changes to business models and organizational structures in the construction industry, as opposed to incremental changes within existing frameworks.
- End to End Focus: Extending focus beyond construction delivery to include standardisation and automation in all stages of a development lifecycle, including business cases, design, cost management, procurement, logistics, and maintenance.
- Commonality and Repeatability: Placing stronger emphasis on common, repeatable processes, systems, and data across multiple projects and organisations, reducing unnecessary variation between projects.
- Integrated Supply Chains: Aiming for deeper, more stable supply chain relationships, that foster long-term collaboration and continuous improvement through alliance based models
- Continuous Improvement: Implementing a clear model for deployment and improvement at a programmatic level, across multiple projects, enhancing sector-wide learning and development.
- Delivering Betters: Striving for improved productivity, sustainability, and quality through systematic, industry-wide changes.
